Design Requirements for Connections to the UCL District Heating Network
The following guidance should be provided to all parties relevant in connecting buildings to UCL’s Bloomsbury campus district heating network
Contents includes:
- Glossary
- Who is this guide for?
- Scope of this guide
- Introduction
- Design approval process
- Project responsibilities
- Heat substation room design
- Secondary heating system design
- Appendix: Typical required secondary heat system schematic