XClose

UCL Department of Civil, Environmental and Geomatic Engineering

Home
Menu

Integrated Design Project 2021

 

In these posters, MEng and MSc students showcase their hard work on the Integrated Design Project this year. Projects included a stadium expansion, closed-loop wastewater system, sustainable hospital and historic bridge replacement.

Hammersmith Bridge, P&M Co.

Alia Binti Faisal, Balqis Binti Zainal, Layyaba Javaid, Muhammad Mehdi Abbas Batool, & Nur Nabilah Mohd Fisol.

Hammersmith Bridge, Epsilon Designs

Anushey Merchant, Jean-Paul Cerceau Agliozzo, Jeremy Wai, Liam Snow & Siu Chung

Closed-Loop Wastewater System, Five Guys

Ama Amadi, Brittany Thackorie, Hange Lao, Oliver Lebrecht & Yu Chen

 

Closed-Loop Wastewater, 1st Class Engineers

Anthony Khouri, Julien Andre-Oraha, Mani Maharjan, Michael Abi Aad & Osilamah Momoh 

Parc des Princes Expansion, Consultius Engineering

Anushey Merchant, Jean-Paul Cerceau Agliozzo, Jeremy Wai, Liam Snow & Siu Chung

Parc des Princes Expansion, Swallow Engineering

K. Sivalogarajah, S. Warren, Z. Aleshaiker, J. Lewis, T. Oliver, C. Wang

 

New Brentford Hospital, IPSUM Associates

Ahmed Al-Hadi, Douraya Kessaria, Jamie Southall, Kamran Hussain & Varman

New Brentford Hospital, SNS Engineering

Mungo Cullinan, Lena Jasim, Charalambos Toumazis, Giovanni Pignatelli, Yashvini Shukla & Hnin Wai

New Brentford Hospital, Zeus

Colin Batte, Cheng Chen, Haotian Gong, Weihua Li & Duo Xie