Fire safety project and design summary aide memoir
- UCL Employers Requirements (ER) - Fire Safety Project & Design Team Summary Aide Memoir
- Summary of Duties - Heads of Faculties, Departments, Schools & Professional Services Etc.
Pre-Contract and On-Site Fire Safety Technical Notes
- Fire Prevention on Construction Sites Guidance - Joint Code of Practice on the Protection from Fire of Construction Site and Buildings Undergoing Renovation (Ninth Edition October 2015)
- Fire Prevention on Construction Sites (Fire Safety Checklist) - Joint Code of Practice on the Protection from Fire of Construction Site and Buildings Undergoing Renovation (Ninth Edition October 2015) - Constitution Site Fire Prevention Checklist
- UCL Principal Contractor Site Fire Safety Risk Review & Mitigation Measures - arrangements for Principal Contractor to ensure adequate fire safety measures to spate Site From UCL Staff
- UCL Building Regulations 38 and Fire Safety Information Required for UCL Occupation at Practical Completion - arrangements and information required by the Principal Contractor
- UCL Estates & Fire Standard (General Performance for Site Hoarding & Contractor Cabins) - arrangements Principal Contractors and Pre-contractor Documents
- Emergency Lighting Systems - Principal Contractors contact information for sites in existing buildings fitted with 'Addressable' emergency lighting systems - pre-works information actions
- Fire Alarms System - Pre-Works Arrangements and Process to Prevent Unwanted Fire Alarms - arrangements for UPO / PMs / Principal Contractor and sub-contractors
Architectural Fire Safety Technical Notes
- Architectural (Fire Safety) Design Guidance - general employers requirements (ERs) around building designs and restrictions
- Principal Design Team / Principal Contractor - new projects practical completion - Regulation 38 Fire Strategies, Drawings & Information Requirements
- Fire Stopping & Passive Fire Protection - arrangements & approved UCL contractors
- Sliding / Revolving Doors & Means of Escape - project general fire safety means of escape design guidance
- Fire Doors / Fire Curtains / Fire Shutters - general UCL fire door design requirements fire door signage
- UCL Halls of Residence - general fire strategy new & refurbishment sleeping accommodation
- Protected Routes, Stairs and Noticeboards - fire safety considerations/limitations within protected routes including the provision of noticeboards
- Lockers (Sloping Roof) for Staff or Student Personal Effects - lockers fire safety considerations
- Fire Safety / Statutory Signage - arrangements, policy & project requirements
- Fire Safety Signs (Laboratories) - general hazard warning, signage and fixing systems
- Seating (Seatway) / Seminar / Lecture Theatre Layouts - guidance for setting out seating in lecture theatres, seminar AJND public events or similar
- Kitchens and Tea Points - general fire design information for all buildings including residences
- Bulk Flammable Liquid & Solvent Storage Facilities - structure design guide
Mechanical, Electrical and Public Health (MEP)
- Principal Design Team / Principal Contractor - new projects practical completion - Regulation 38 Fire Strategies, Drawings and Information Requirements
- Fire Stopping & Passive Fire Protection - arrangements & approved UCL contractors
- Access Security Systems (Electronic Locking) & Accessible Door Opening Devices on Means of Escape - door locking and design requirements etc
- Sliding & Revolving Doors - general guidance on their use on escape routes
- Hearing Impaired Persons - Fire Alarm Warning (Deaf Texting Facilities) - being alerted, when the fire alarm sounds for deaf and hard of hearing in an emergency
- Emergency Lighting - UCL's Employers Requirements (ERs) for the installation
- Emergency Lighting Systems - general contractors contact Information for existing 'Addressable Emergency Lighting' systems in refurbish or existing UCL buildings - pre works information actions
- Building Electrical & Mechanical Services Interfaces & Fire Brigade Equipment - including air handling, CL3 Labs, smoke control systems- FB Switches & Controls etc.
- Fume Cupboards Fire Suppression Installation Guidance - MEP general UCL specifications and detail installation information for the provision of fire suppression in fume cupboards
- Firefighters' Switches - Prescribed Voltages, High Voltage Electrical Luminous Tubes & Signs and Voltages generated in Photovoltaic (PV) roof equipment etc.
- Fire Alarms Systems Design Guidance All Buildings (with the Exception of Sleeping Accommodation) - MEP general UCL specifications and employers requirements (ERs)
- Fire Alarms Systems Design Guidance (Sleeping Accommodation / Halls of Residences) - general UCL specifications and employers requirements (ERs) for Cause & Effect Room Mode & Setup (TN055A) and Domestic Houses, Studio & Flats (TN055B)
- Fire Alarms Systems Design Guidance (Provision of Audible & Visual Warning at Internal Building Boundaries) - MEP general UCL specifications and employers requirements (ERs)
- Biological Service Units (BSU) - Specialist Fire Alarm / Emergency Lighting Requirements & Other Related Information) - fire alarm and design specifications and employers requirements (ERs)
- PHOTOVOLTAIC (PV) Systems Installation & Safety Arrangements - design considerations for both sustainability and safety provisions
- Kitchen / Tea Point General Fire Design Information - MEP general UCL specifications and employers requirements (ERs)
- Bulk Flammable Liquid & Solvent Storage Facilities - MEP general UCL specifications and employers requirements (ERs)
- Disable Refuge Communications - UCL ISD project manager briefing note on managing Disabled Refuge Telephones for new projects (where appropriate and authorised)
Post Occupation Information
- Occupation fire safety familiarisation requirements