Skip to main content
UCL Logo Navigate back to homepage

Main navigation

  • Home
  • Study

    Study

    • Study at UCL
    • Prospective students
    • Current students
    • Accommodation
    • Careers
    • Doctoral School
    • Immigration and visas
    • Student finances
    • Support and wellbeing
  • Research

    Research

    • Research at UCL
    • Engage with us
    • Explore our Research
    • Initiatives and networks
    • Research news
  • Engage

    Engage

    • Engage with UCL
    • Alumni
    • Business partnerships and collaboration
    • Global engagement
    • News and Media relations
    • Public Policy
    • Schools and priority groups
    • Give to UCL
  • About

    About

    • About UCL
    • Who we are
    • Faculties
    • Governance
    • President and Provost
    • Strategy
    • UCL's Bicentenary
  • UCL Logo Active parent page: UCL Bartlett Faculty of the Built Environment
    • Study
    • Active parent page: Research
    • Our schools and institutes
    • People
    • Ideas
    • Engage
    • News and Events
    • About

BIM in healthcare: Can BIM effectively deliver estate related projects within NHS?

the exterior of University College Hospital

Breadcrumb trail

  • UCL Bartlett Faculty of the Built Environment

Faculty menu

  • Current page: Research projects
  • Research publications
  • REF 2021
  • Ethics in the built environment
  • Impact at The Bartlett
  • UCL Royal Academy of Engineering, Centre of Excellence in Sustainable Building Design
  • The Building Envelope Research Network
  • UCL Circularity Hub

Breadcrumb trail

  • UCL Bartlett Faculty of the Built Environment
  • Research
  • BIM in healthcare: Can BIM effectively deliver estate related projects within NHS?

Key facts

Funding Body/Client:  University College London Hospital
Project Partners:  UCLH
Total Project Value: £65,000 
UCL/IEDE Project Value Share £65,000/£65,000 
Duration: 2012-2016

BIM in its current form emerged as a consequence of published Government Construction Strategy which addressed the need for waste reduction within public sector construction projects by 2016. This strong pledge was a reaction to growing inefficiencies within the built environment industry such as duplicating work, unnecessary reworks, poorly structured contracts, lack of control mechanisms opinions, and inefficient work organisation. The recent economic crisis has caused hardship within the built environment industry. Therefore, to battle the domino effect the UK government decided to pursue the strategy, which would maximize market potential and add value (in form of savings or efficiencies) to the projects across the whole life-cycle. BIM implementation necessitates formation of a robust set of information management processes and, most of all, becoming an informed client. This will facilitate the delivery of intelligent buildings and as a consequence reduce waste, introduce more certainty, allow for more informed decision-making, and minimize project risk. Despite promised benefits and multiple success stories, BIM is struggling to break through to world of clients (hospitals) and facilities management as opposed to the supply chain (design team, contractors). This research therefore investigates the issues of process alignment and impact of BIM in healthcare.

People

PI: Michael Pitt 

Rs:  Paulina Zakrzewska and Tahir Ahmed (UCLH) 

Output

As part of this project both the DoH and Cabinet Office mandated the use of BIM on UCLH with the general assumption that it would enable more efficient design, construction as well as further facility management.  The research therefore aims to produce the following outputs:

1. Formulation of a conceptual framework for the BIM in NHS, and its further implementation and evaluation.

2. Identification of success factors and primary barriers for process alignment 

3. Examination of gap between CapEx and OpEx and BIM influence in bridging this gap 

4. Performance of 360 degrees analysis across the whole building life cycle to

investigate what industry players would benefit BIM implementation most

5. Examination whether the BIM benefits can be capitalized on major complex healthcare projects

Impact

It is envisaged that the research will result in a new and different understanding of new process/legislation implementation within the established corporate processes. However, the direct impact of this BIM focused research will be illustrated through the creation of a more informed client and viewing BIM as an operational and management tool as well as its effective delivery within the NHS built environment projects and its further operations ultimately allowing for maintenance of intelligent buildings. Finally, the research strives to influence the current body of knowledge and further explore the role of BIM process, process alignment and client vs supply chain engagement. 

Links

For further information please contact: Paulina Zakrzewska

UCL footer

Visit

  • Bloomsbury Theatre and Studio
  • Library, Museums and Collections
  • UCL Maps
  • UCL Shop
  • Contact UCL

Students

  • Accommodation
  • Current Students
  • Moodle
  • Students' Union

Staff

  • Inside UCL
  • Staff Intranet
  • Work at UCL
  • Human Resources
UCL Logo

University College London, Gower Street, London, WC1E 6BT

Tel: +44 (0) 20 7679 2000

UCL social media menu

  • Link to Instagram
  • Link to LinkedIn
  • Link to Youtube
  • Link to TikTok
  • Link to Facebook
  • Link to Bluesky
  • Link to Threads
  • Link to Soundcloud
Here, it can happen.
Back to top

Essential

  • Disclaimer
  • Freedom of Information
  • Accessibility
  • Cookies
  • Privacy
  • Slavery statement
  • Log in

© 2026 UCL