Skip to main content
UCL Logo Navigate back to homepage

Main navigation

  • Home
  • Study

    Study

    • Study at UCL
    • Prospective students
    • Current students
    • Accommodation
    • Careers
    • Doctoral School
    • Immigration and visas
    • Student finances
    • Support and wellbeing
  • Research

    Research

    • Research at UCL
    • Engage with us
    • Explore our Research
    • Initiatives and networks
    • Research news
  • Engage

    Engage

    • Engage with UCL
    • Alumni
    • Business partnerships and collaboration
    • Global engagement
    • News and Media relations
    • Policy and political engagement
    • Schools and priority groups
    • Give to UCL
  • About

    About

    • About UCL
    • Who we are
    • Faculties
    • Governance
    • President and Provost
    • Strategy
    • UCL's Bicentenary
  • UCL Logo Active parent page: UCL Bartlett Faculty of the Built Environment
    • Study
    • Active parent page: Research
    • Our schools and institutes
    • People
    • Ideas
    • Engage
    • News and Events
    • About

Major Infrastructure Planning and Delivery

Exploring Nationally Significant Infrastructure Projects (NSIPs) in England and Wales. Ben Clifford and Janice Morphet, published by UCL Press

Breadcrumb trail

  • UCL Bartlett Faculty of the Built Environment

Faculty menu

  • Research projects
  • Current page: Research publications
  • REF 2021
  • Ethics in the built environment
  • Impact at The Bartlett
  • UCL Royal Academy of Engineering, Centre of Excellence in Sustainable Building Design
  • The Building Envelope Research Network
  • UCL Circularity Hub

Breadcrumb trail

  • UCL Bartlett Faculty of the Built Environment
  • Research
  • Major Infrastructure Planning and Delivery

Download for free via UCL Press

Abstract

Major Infrastructure Planning and Delivery introduces the system for planning and consenting Nationally Significant Infrastructure Projects (NSIPs) in England (which has also applied for some schemes in Wales). These are the major projects involving power stations and large renewable energy schemes, motorways, railways and a range of other high profile, high impact and sometimes controversial development schemes, including some closely linked to the UK’s transition to net zero.

The book explains where this separate system for governing major infrastructure came from and how it operates in practice, with a particular focus on the relationship between planning, consent and delivery of these infrastructure projects. Detailed case studies of the A14 highway, Thames Tideway super sewer, Galloper offshore windfarm and Progress Power station, drawing on research by the authors, illustrate issues of the often overlooked continuing role of local government, the engagement of local communities and stakeholders, and the modification of schemes between consent and construction.

At a time of ongoing government planning reform, increased concern about climate change, and still unresolved consequences of Brexit, as well as timeless debates such as over national need versus local impact, this timely book offers rich detail on the particular approach to major infrastructure planning in England, but also speaks to wider issues around the governance of development and implementation of government policy under late capitalism.

UCL footer

Visit

  • Bloomsbury Theatre and Studio
  • Library, Museums and Collections
  • UCL Maps
  • UCL Shop
  • Contact UCL

Students

  • Accommodation
  • Current Students
  • Moodle
  • Students' Union

Staff

  • Inside UCL
  • Staff Intranet
  • Work at UCL
  • Human Resources
UCL Logo

University College London, Gower Street, London, WC1E 6BT

Tel: +44 (0) 20 7679 2000

UCL social media menu

  • Link to Instagram
  • Link to LinkedIn
  • Link to Youtube
  • Link to TikTok
  • Link to Facebook
  • Link to Bluesky
  • Link to Threads
  • Link to Soundcloud
Here, it can happen.
Back to top

Essential

  • Disclaimer
  • Freedom of Information
  • Accessibility
  • Cookies
  • Privacy
  • Slavery statement
  • Log in

© 2026 UCL