Future Library Project: images

PCs before the Refurbishment
PCs during the Refurbishment
PCs after the Refurbishment
Public computers: before
Public computers: during There are now 9 workstations, with both Institute and UCLH computers at each desk
UCLH PCs before the Refurbishment
UCLH PCs during the Refurbishment
UCLH PCs after the Refurbishment
UCLH computer room: before
UCLH computer room: during Switch from an Institute to a UCLH networked computer at the click of a button.
View to the left before the Refurbishment
View to the left during the Refurbishment
View to the left after the Refurbishment
The left-hand side of the library: before
The left-hand side of the library: during
Solid walls have made way for displays housing some of the amazing items in the collections
Quiet Study Area before the Refurbishment
Quiet Study Area during the Refurbishment
Quiet Study Area after the Refurbishment
The study desks area: before
The study desk area: during
There are now a total of 33 reader spaces including facilities for group and quiet study
Historical Room before the Refurbishment: 1
Historical Room during the Refurbishment: 1
Historical Room after the Refurbishment: 1
The historical room: before
The historical room: during
The rare books and archives are now housed in an air conditioned central "pod"
Historical Room before the Refurbishment: 2
Historical Room during the Refurbishment: 2
Historical Room after the Refurbishment: 2
The historical room: before
The historical room: during
Books and archives are kept safe and secure, while still allowing you to browse the amazing collections.
Journals Collection before the Refurbishment
Journals Collection during the Refurbishment
Journals Collection after the Refurbishment
The journal collection: before
The journal collection: during
The specialist journals remain available on site but are now stored in space efficient mobile shelving.
Bookroom before the refurbishment
Bookroom during the refurbishment
Bookroom after the refurbishment
The book room: before
The book room: during
The current book collections are easily accessible around the outside of the archives pod.
Desk before the Refurbishment Desk during the Refurbishment Desk after the Refurbishment
The library desk: before
The library desk: during
Much more space for Library visitors and Library staff.
    Training Room after the Refurbishment
    We now have a purpose built training room and have launched an extensive range of courses. Click on the image to find out more.

Comments & Suggestions | Disclaimer | Copyright | Webmail
Queen Square Library. Formerly the Rockefeller Medical Library. Incorporating the Queen Square Archive and Museum.
1st Floor, 23 Queen Square, London WC1N 3BG, UK | Tel: 020 3448 4709 x84144 | neurolibrary@ucl.ac.uk
find us on facebook | follow us on twitter

UCLH Foundations TrustIoNNHNN logo